Single-storey rear extensions in Dudley
A single-storey extension in Dudley starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in DudleyFrom £20,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsB64, B65, B69, DY1, DY2

Guide prices for Dudley
These guide figures apply our West Midlands adjustment (×0.97) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Dudley: £1,700 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £20,000 – £24,000 | £23,500 – £30,500 | £30,000 – £40,000 |
| 4 m × 5 m 20 m² | £33,500 – £40,000 | £39,500 – £50,500 | £50,000 – £66,000 |
| 5 m × 6 m 30 m² | £50,500 – £60,000 | £59,500 – £76,000 | £75,500 – £99,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Covering Dudley
Postcode districts we cover around Dudley include B64, B65, B69, DY1, DY2, DY5. Neighbouring towns we cover include Brierley Hill (2 miles), Tipton (2 miles), Kingswinford (4 miles), Halesowen (4 miles).
Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
Included in a typical project
- Flat or pitched roof, rooflights or lantern
- Measured survey and design
- Planning route checked and the right approval obtained
- Walls, steel beams and the new opening into the house
Depth is the big decision. Every extra metre adds floor area but also takes garden and can push you out of permitted development. We draw the room at two or three depths so you can see the trade-off in space, light and cost before anything is fixed.
Will the council need to approve it?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Single-storey extension questions answered
Do I need building regulations approval in Dudley?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who do I contract with for a single-storey extension in Dudley?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a single-storey extension take to build in Dudley?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Can I stay in the house during the build?
Usually yes. Most of the work happens outside until the final weeks, when we open the rear wall. We plan that stage carefully and seal the opening with a temporary screen to keep dust down.
Will I need a steel beam?
Almost always. Opening up the rear wall to join the new room to the house needs a beam, usually steel, sized by a structural engineer. It is included in our quotes.
Book a free site visit in Dudley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end