house-extension.uk
West Midlands

House extensions in Dudley

More space without moving: we plan and build extensions across Dudley, with one team for the drawings, the council and the build.

  • Postcode districtsB64, B65, B69, DY1, DY2, DY5
  • Price regionWest Midlands (×0.97)
  • Planning rulesEngland
  • Site visitFree, no obligation
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Dudley and surrounding towns

Site visits are available across Dudley (B64, B65, B69, DY1, DY2, DY5). Neighbouring towns we cover include Brierley Hill (2 miles), Tipton (2 miles), Kingswinford (4 miles), Halesowen (4 miles), Stourbridge (4 miles). Just over the Worcestershire border, Kidderminster is about 10 miles away.

Which extension suits a Dudley home?

Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.

Start by comparing extensions over a garage, double-storey extensions and single-storey rear extensions: between them they cover most of the layouts we see requested for houses like these.

Do extensions in Dudley need planning permission?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Guide prices for Dudley

Use these Dudley guide prices to sense-check a budget; the guide-price tool narrows them to your own size, and the site visit turns them into a written figure.

Extension typeExample sizeStandard spec (inc VAT)
Orangery extensions16 m²£43,000 – £54,500
Kitchen extensions20 m²£40,500 – £51,500
Side return extensions11 m²£25,500 – £32,500
Double-storey extensions32 m²£55,500 – £73,000
Wraparound extensions25 m²£55,500 – £70,500
  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions about extensions in Dudley

How much does an extension cost in Dudley?

Using our West Midlands factor (×0.97), a standard-spec single-storey extension of 20 m² is a guide £39,500 to £50,500 including VAT, and a 32 m² two-storey extension £55,500 to £73,000. Your written price follows the survey.

Do you cover all of Dudley?

Yes, including the surrounding parts of West Midlands. Site visits are free and there is no obligation.

How long does an extension take in Dudley?

Usually 2 to 4 months of design and approvals, then 10 to 16 weeks on site for a single-storey extension or 16 to 24 weeks for two storeys.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will my neighbours need to be told?

If you apply for planning or prior approval the council notifies them, and in England party wall notices may be needed for work near a shared boundary.

Book a free site visit in Dudley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote