Side return extensions in Dursley: design, approvals and build
Our design and build teams take on side return extensions in Dursley, from the first measured survey through planning and building control to the finished room.
- Guide price in DursleyFrom £18,000 inc VAT
- PlanningOften permitted development; party wall notice usual
- Build time10–14 weeks on site
- Postcode districtsGL11

Planning rules that apply in Dursley
In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Dursley
Site visits are available across Dursley (GL11). Nearby, we also take on projects in Stroud (8 miles), Thornbury (10 miles), Yate (11 miles), Gloucester (13 miles).
Ross-on-Wye, in Herefordshire, is roughly 18 miles from Dursley and also on our list. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Who a side return extension suits
- Narrow galley kitchens
- Homes where the garden is too small to lose much depth
- Victorian and Edwardian terraces with a rear outrigger
Light is the design problem. A side return can make the middle of the house darker if the roof is solid, so we model the daylight and usually recommend a glazed slope or a run of rooflights along the boundary edge.
Guide prices for Dursley
For Dursley we adjust our national guide rates by ×1.02, the factor we use for South West England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Dursley: £2,140 to £3,880 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 1.8 m × 4.5 m 8 m² | £18,000 – £22,000 | £19,500 – £24,500 | £24,000 – £31,500 |
| 2 m × 5.5 m 11 m² | £23,500 – £28,500 | £26,500 – £34,000 | £33,500 – £43,000 |
| 2.2 m × 7 m 15 m² | £32,000 – £38,500 | £36,500 – £46,000 | £45,500 – £58,500 |
Try the guide-price tool to see a range for your own size and finish.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about side return extensions
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Dursley, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Who do I contract with for a side return extension in Dursley?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a side return extension take to build in Dursley?
On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Can I combine a side return with a rear extension?
Yes. That combination is a wraparound extension, which adds the most space to a terraced house.
Will the kitchen be darker?
Not if the roof is designed well. A glazed roof or a line of rooflights along the boundary usually makes the room brighter than before.
Book a free site visit in Dursley
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end