house-extension.uk

Hitchin side extensions, designed and built

If you live in Hitchin and want more space without moving, a side extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in HitchinFrom £23,000 inc VAT
  • PlanningSingle storey can be permitted development
  • Build time10–18 weeks on site
  • Postcode districtsSG4, SG5
Single-storey side extension with a gable roof beside a block-paved drive

How much does a side extension cost in Hitchin?

Prices below are for Hitchin, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Hitchin: £1,860 to £3,600 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2.5 m × 5 m
12 m²
£23,000 – £28,000£26,000 – £34,000£33,000 – £43,500
3 m × 6 m
18 m²
£33,000 – £40,500£39,000 – £51,000£49,500 – £65,000
3 m × 8 m
24 m²
£44,500 – £53,500£52,000 – £67,500£66,000 – £86,500

Want a range for your exact size? The guide-price tool takes about a minute.

What is included

  • Survey, design and street-view drawings
  • New openings through the side wall
  • Foundations near boundaries and any drains
  • Planning route checked or application made
  • Windows, doors and finishes to match

Do I need planning permission in Hitchin?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering Hitchin

Postcode districts we cover around Hitchin include SG4, SG5. Nearby, we also take on projects in Letchworth Garden City (3 miles), Stevenage (5 miles), Harpenden (10 miles), Welwyn Garden City (11 miles).

Just over the Bedfordshire border, Luton is about 7 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Hitchin

Who do I contract with for a side extension in Hitchin?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Hitchin, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a side extension take to build in Hitchin?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Can I build over my driveway?

Yes, if the foundations work and you keep any parking the council requires. Drains and services under drives are common, so we check before design.

How close to the boundary can I build?

It depends on height. In England, within 2 m of a boundary the eaves must not exceed 3 m under permitted development. Building on the boundary is possible but brings party wall and maintenance access issues we plan for.

Book a free site visit in Hitchin

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote