house-extension.uk

Side extensions for homes in Welwyn Garden City

Welwyn Garden City homeowners can use us for the whole side extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in Welwyn Garden CityFrom £23,000 inc VAT
  • PlanningSingle storey can be permitted development
  • Build time10–18 weeks on site
  • Postcode districtsAL6, AL7, AL8, AL10
Single-storey side extension with a gable roof beside a block-paved drive

When a side extension makes sense

  • Detached and semi-detached houses with side land
  • Homes needing a utility, study or ground-floor bedroom
  • Houses where the rear garden is small

Extensions in and around Welwyn Garden City

Postcode districts we cover around Welwyn Garden City include AL6, AL7, AL8, AL10. We also work in nearby Hatfield (3 miles), Hertford (6 miles), St Albans (6 miles), Harpenden (6 miles).

For homes towards Bedfordshire, Luton is around 10 miles away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

Side extension prices in Welwyn Garden City

Prices below are for Welwyn Garden City, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Welwyn Garden City: £1,860 to £3,600 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2.5 m × 5 m
12 m²
£23,000 – £28,000£26,000 – £34,000£33,000 – £43,500
3 m × 6 m
18 m²
£33,000 – £40,500£39,000 – £51,000£49,500 – £65,000
3 m × 8 m
24 m²
£44,500 – £53,500£52,000 – £67,500£66,000 – £86,500

For a figure based on your own dimensions, use our guide-price tool.

Planning and approvals in Welwyn Garden City

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a householder planning application.

The planning position for a specific Welwyn Garden City address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Welwyn Garden City home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Side extension questions answered

How long does a side extension take to build in Welwyn Garden City?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Do you cover all of Welwyn Garden City?

Yes. We cover Welwyn Garden City and the surrounding parts of Hertfordshire. Site visits are free and there is no obligation.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Welwyn Garden City, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Can I build a side extension without planning permission?

In England a single-storey side extension can be permitted development if it is no more than 4 m high and no wider than half the width of the original house. Two-storey side extensions, and any side extension on designated land such as a conservation area, need a planning application.

How close to the boundary can I build?

It depends on height. In England, within 2 m of a boundary the eaves must not exceed 3 m under permitted development. Building on the boundary is possible but brings party wall and maintenance access issues we plan for.

Book a free site visit in Welwyn Garden City

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote