house-extension.uk

Extensions over a garage across Eastbourne

Thinking about an over-garage extension for your Eastbourne home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.

  • Guide price in EastbourneFrom £26,500 inc VAT
  • PlanningHouseholder application needed
  • Build time12–18 weeks on site
  • Postcode districtsBN20, BN21, BN22, BN23, BN24
Detached house with a bedroom extension above the attached garage

Over-garage extension prices in Eastbourne

Prices below are for Eastbourne, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Eastbourne: £2,020 to £3,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Over a single garage
12 m²
£26,500 – £33,000£28,000 – £36,500£36,000 – £46,000
Over a large single garage
16 m²
£32,000 – £39,500£37,500 – £48,500£48,000 – £61,000
Over a double garage
24 m²
£48,000 – £59,500£56,000 – £73,000£72,500 – £91,500

Try the guide-price tool to see a range for your own size and finish.

Extensions in and around Eastbourne

Across BN20, BN21, BN22, BN23, BN24, BN26, we can visit, measure and advise. Nearby, we also take on projects in Hailsham (7 miles), Seaford (8 miles), Bexhill-on-Sea (10 miles), Peacehaven (13 miles).

For homes towards West Sussex, Burgess Hill is around 22 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.

When an over-garage extension makes sense

  • Families needing a bedroom without losing garden
  • Detached and link-detached houses with an attached garage
  • Homes where the landing can connect to the new room

Will the council need to approve it?

In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Over-garage extension questions answered

Will my neighbours in Eastbourne be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Eastbourne, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does an over-garage extension take to build in Eastbourne?

On site, typically 12 to 18 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Does building over a garage need planning permission?

In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.

Can my garage take the weight of a room on top?

Some can and some cannot. Many garages have a single-skin wall or shallow foundations. Our structural engineer checks this before we give a fixed price.

Book a free site visit in Eastbourne

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote