house-extension.uk

Orangery extensions across Eastbourne

A orangery extension in Eastbourne starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in EastbourneFrom £33,500 inc VAT
  • PlanningSame limits as single-storey rear; glazing checked for building regs
  • Build time10–16 weeks on site
  • Postcode districtsBN20, BN21, BN22, BN23, BN24
Orangery extension with brick piers, a glass roof lantern and French doors

How much does an orangery extension cost in Eastbourne?

Prices below are for Eastbourne, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Eastbourne: £2,690 to £5,040 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£33,500 – £41,000£37,500 – £47,500£45,500 – £60,500
4 m × 4 m
16 m²
£43,000 – £52,000£50,000 – £63,000£60,500 – £81,000
4 m × 6 m
24 m²
£64,500 – £78,000£75,000 – £94,500£91,000 – £121,000

For a figure based on your own dimensions, use our guide-price tool.

What is included

  • Foundations, walls and insulated perimeter roof
  • Opening into the main house
  • Thermal calculations where glazing is generous
  • Design of piers, roof perimeter and lantern proportions

Covering Eastbourne

Postcode districts we cover around Eastbourne include BN20, BN21, BN22, BN23, BN24, BN26. We also work in nearby Hailsham (7 miles), Seaford (8 miles), Bexhill-on-Sea (10 miles), Peacehaven (13 miles).

For homes towards West Sussex, Burgess Hill is around 22 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

Do I need planning permission in Eastbourne?

In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Eastbourne

Will my neighbours in Eastbourne be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Eastbourne?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does an orangery extension take to build in Eastbourne?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.

Will an orangery be too hot in summer?

Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.

Book a free site visit in Eastbourne

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote