Home office extensions for homes in Eastbourne
We design and build home office extensions for houses in Eastbourne, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in EastbourneFrom £17,500 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–12 weeks on site
- Postcode districtsBN20, BN21, BN22, BN23, BN24

Extensions in and around Eastbourne
Across BN20, BN21, BN22, BN23, BN24, BN26, we can visit, measure and advise. Nearby, we also take on projects in Hailsham (7 miles), Seaford (8 miles), Bexhill-on-Sea (10 miles), Peacehaven (13 miles).
In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.
What should I budget for a home office extension in Eastbourne?
Labour and material costs vary across the UK, so for Eastbourne we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Eastbourne: £2,070 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2.5 m × 3.2 m 8 m² | £17,500 – £21,500 | £19,000 – £24,500 | £24,000 – £30,500 |
| 3 m × 3.6 m 11 m² | £22,500 – £27,500 | £26,000 – £33,500 | £33,000 – £42,000 |
| 3 m × 5 m 15 m² | £31,000 – £37,000 | £36,000 – £45,500 | £45,000 – £57,500 |
For a figure based on your own dimensions, use our guide-price tool.
Do I need planning permission in Eastbourne?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific Eastbourne address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What we take care of
- Window and rooflight placement to avoid screen glare
- Heating or cooling sized for the room
- Data cabling and plenty of sockets
- Sound insulation to the adjoining rooms
- Layout for desk, storage and video calls
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a home office extension in Eastbourne
Will my neighbours in Eastbourne be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a home office extension in Eastbourne?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a home office extension take to build in Eastbourne?
On site, typically 8 to 12 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.
Can I claim the cost against tax?
Building work on your home is not normally an allowable business expense, and claiming it can have capital gains tax effects. Speak to an accountant before assuming any tax relief.
Is an attached office better than a garden office?
An attached office shares the house heating and broadband, adds floor area to the home, and needs no garden path in the rain. A garden building can be cheaper and quicker but is a separate structure.
Book a free site visit in Eastbourne
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.