Tynemouth orangery extensions, designed and built
We design and build orangery extensions for houses in Tynemouth, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in TynemouthFrom £27,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsNE25, NE26, NE29, NE30, NE33

Local to Tynemouth
We cover Tynemouth and the postcode districts NE25, NE26, NE29, NE30, NE33, NE34. We also work in nearby North Shields (1 mile), South Shields (1 mile), Whitley Bay (2 miles), Jarrow (3 miles).
For homes towards Northumberland, Cramlington is around 8 miles away. The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.
When an orangery extension makes sense
- Those who want daylight without overheating
- Period and detached houses with a garden view
- Homeowners replacing an older conservatory
Will the council need to approve it?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Orangery extension prices in Tynemouth
Labour and material costs vary across the UK, so for Tynemouth we use our North East England factor (×0.91). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Tynemouth: £2,180 to £4,100 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £27,000 – £33,000 | £30,500 – £38,500 | £37,000 – £49,500 |
| 4 m × 4 m 16 m² | £34,500 – £42,500 | £40,500 – £51,000 | £49,500 – £66,000 |
| 4 m × 6 m 24 m² | £52,000 – £63,500 | £61,000 – £76,500 | £74,000 – £98,500 |
For a figure based on your own dimensions, use our guide-price tool.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about an orangery extension in Tynemouth
Will my neighbours in Tynemouth be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for an orangery extension in Tynemouth?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Tynemouth?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in Tynemouth
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.