Orangery extensions for homes in North Shields
North Shields homeowners can use us for the whole orangery extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in North ShieldsFrom £27,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsNE25, NE26, NE27, NE29, NE30

Working in North Shields
We cover North Shields and the postcode districts NE25, NE26, NE27, NE29, NE30, NE33. Nearby, we also take on projects in Tynemouth (1 mile), South Shields (1 mile), Whitley Bay (2 miles), Jarrow (3 miles).
For homes towards Northumberland, Cramlington is around 7 miles away. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.
What should I budget for an orangery extension in North Shields?
Prices below are for North Shields, using the North East England factor of ×0.91. They are guide ranges including VAT for the build only, not a quote.
Typical rates in North Shields: £2,180 to £4,100 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £27,000 – £33,000 | £30,500 – £38,500 | £37,000 – £49,500 |
| 4 m × 4 m 16 m² | £34,500 – £42,500 | £40,500 – £51,000 | £49,500 – £66,000 |
| 4 m × 6 m 24 m² | £52,000 – £63,500 | £61,000 – £76,500 | £74,000 – £98,500 |
Try the guide-price tool to see a range for your own size and finish.
What is included
- Design of piers, roof perimeter and lantern proportions
- Heating sized for the glass area
- Thermal calculations where glazing is generous
- Opening into the main house
- Foundations, walls and insulated perimeter roof
Will the council need to approve it?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions people ask about orangery extensions
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for North Shields, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of North Shields?
Yes. We cover North Shields and the surrounding parts of Tyne and Wear. Site visits are free and there is no obligation.
How long does an orangery extension take to build in North Shields?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.
Book a free site visit in North Shields
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.