Newburn orangery extensions, designed and built
Planning an orangery extension in Newburn? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in NewburnFrom £27,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsNE5, NE15, NE21, NE40

Is an orangery extension right for your house?
- Homeowners replacing an older conservatory
- Period and detached houses with a garden view
- Those who want daylight without overheating
Guide prices for Newburn
For Newburn we adjust our national guide rates by ×0.91, the factor we use for North East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Newburn: £2,180 to £4,100 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £27,000 – £33,000 | £30,500 – £38,500 | £37,000 – £49,500 |
| 4 m × 4 m 16 m² | £34,500 – £42,500 | £40,500 – £51,000 | £49,500 – £66,000 |
| 4 m × 6 m 24 m² | £52,000 – £63,500 | £61,000 – £76,500 | £74,000 – £98,500 |
For a figure based on your own dimensions, use our guide-price tool.
Extensions in and around Newburn
Site visits are available across Newburn (NE5, NE15, NE21, NE40). We also work in nearby Gosforth (5 miles), Newcastle upon Tyne (5 miles), Gateshead (6 miles), Felling (7 miles).
Stanley, in County Durham, is roughly 8 miles from Newburn and also on our list. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.
Do I need planning permission in Newburn?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Common questions in Newburn
Who do I contract with for an orangery extension in Newburn?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does an orangery extension take to build in Newburn?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do I need building regulations approval in Newburn?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How much does an orangery cost?
Our guide range is about £2,180 to £4,100 per m² including VAT, so a 16 m² standard-spec orangery is typically £40,500 to £51,000 in Newburn.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in Newburn
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.