house-extension.uk

Double-storey extensions in Newburn

Newburn homeowners can use us for the whole double-storey extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in NewburnFrom £34,500 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsNE5, NE15, NE21, NE40
Two-storey rear extension on a brick semi-detached house with a hipped roof

Covering Newburn

We cover Newburn and the postcode districts NE5, NE15, NE21, NE40. The same team covers Gosforth (5 miles), Newcastle upon Tyne (5 miles), Gateshead (6 miles), Felling (7 miles), all within easy reach.

For homes towards County Durham, Stanley is around 8 miles away. The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.

Guide prices for Newburn

Prices below are for Newburn, using the North East England factor of ×0.91. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Newburn: £1,410 to £2,730 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£34,500 – £41,500£39,000 – £51,500£50,000 – £66,000
4 m × 4 m, two floors
32 m²
£45,000 – £54,000£52,000 – £68,500£66,500 – £87,500
4 m × 6 m, two floors
48 m²
£67,500 – £81,000£78,500 – £103,000£100,000 – £131,500

Try the guide-price tool to see a range for your own size and finish.

When a double-storey extension makes sense

  • Growing families who need a bedroom as well as a bigger kitchen
  • Houses with enough distance to the rear or side boundary
  • Homeowners who would otherwise consider moving

Planning rules that apply in Newburn

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Newburn

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Newburn, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a double-storey extension take to build in Newburn?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Will my neighbours in Newburn be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Is a two-storey extension cheaper per square metre?

Usually. Our guide range is about £1,410 to £2,730 per m² of new floor area including VAT, compared with £1,590 to £3,090 per m² for single-storey work, because the foundations and roof are shared across two floors.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Book a free site visit in Newburn

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote