house-extension.uk

Gateshead orangery extensions, designed and built

Planning an orangery extension in Gateshead? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in GatesheadFrom £27,000 inc VAT
  • PlanningSame limits as single-storey rear; glazing checked for building regs
  • Build time10–16 weeks on site
  • Postcode districtsNE1, NE2, NE4, NE6, NE8
Orangery extension with brick piers, a glass roof lantern and French doors

Extensions in and around Gateshead

Postcode districts we cover around Gateshead include NE1, NE2, NE4, NE6, NE8, NE99. Neighbouring towns we cover include Newcastle upon Tyne (1 mile), Felling (1 mile), Gosforth (3 miles), Wallsend (3 miles).

Chester-le-Street, in County Durham, is roughly 7 miles from Gateshead and also on our list. The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.

When an orangery extension makes sense

  • Those who want daylight without overheating
  • Period and detached houses with a garden view
  • Homeowners replacing an older conservatory

Orangery extension prices in Gateshead

Prices below are for Gateshead, using the North East England factor of ×0.91. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Gateshead: £2,180 to £4,100 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m
12 m²
£27,000 – £33,000£30,500 – £38,500£37,000 – £49,500
4 m × 4 m
16 m²
£34,500 – £42,500£40,500 – £51,000£49,500 – £66,000
4 m × 6 m
24 m²
£52,000 – £63,500£61,000 – £76,500£74,000 – £98,500

For a figure based on your own dimensions, use our guide-price tool.

Planning rules that apply in Gateshead

In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Gateshead home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Gateshead

Who do I contract with for an orangery extension in Gateshead?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Gateshead, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do I need building regulations approval in Gateshead?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

What is the difference between an orangery and a conservatory?

An orangery has a solid roof perimeter with a central lantern and more solid wall, so it is warmer and more like a room. A conservatory is mostly glass. Building regulations treat a heated orangery joined to the house as an extension.

Does an orangery need planning permission?

It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.

Book a free site visit in Gateshead

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote