Orangery extensions for homes in Cannock
We design and build orangery extensions for houses in Cannock, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in CannockFrom £29,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsWS6, WS11, WS12

Covering Cannock
Our survey diary covers Cannock, including WS6, WS11, WS12. Neighbouring towns we cover include Great Wyrley (2 miles), Burntwood (4 miles), Rugeley (6 miles), Lichfield (9 miles).
Just over the West Midlands border, Bloxwich is about 5 miles away. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
Guide prices for Cannock
For Cannock we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Cannock: £2,330 to £4,360 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £29,000 – £35,500 | £32,500 – £41,000 | £39,500 – £52,500 |
| 4 m × 4 m 16 m² | £37,000 – £45,500 | £43,000 – £54,500 | £52,500 – £70,000 |
| 4 m × 6 m 24 m² | £55,500 – £68,000 | £65,000 – £81,500 | £79,000 – £105,000 |
Try the guide-price tool to see a range for your own size and finish.
What is included
- Opening into the main house
- Aluminium or timber lantern and full-height glazing
- Design of piers, roof perimeter and lantern proportions
- Thermal calculations where glazing is generous
- Foundations, walls and insulated perimeter roof
Do I need planning permission in Cannock?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Cannock home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about orangery extensions
Do I need building regulations approval in Cannock?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does an orangery extension take to build in Cannock?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
Do you cover all of Cannock?
Yes. We cover Cannock and the surrounding parts of Staffordshire. Site visits are free and there is no obligation.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Will an orangery be too hot in summer?
Not if it is designed with solar-control glass, a solid perimeter and ventilation. We size the lantern and opening vents with that in mind.
Book a free site visit in Cannock
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.