house-extension.uk
Staffordshire

House extensions in Cannock

More space without moving: we plan and build extensions across Cannock, with one team for the drawings, the council and the build.

  • Postcode districtsWS6, WS11, WS12
  • Price regionWest Midlands (×0.97)
  • Planning rulesEngland
  • Site visitFree, no obligation
Two-storey rear extension on a brick semi-detached house with a hipped roof

Guide prices for Cannock

We publish guide prices so you can budget before anyone visits. For Cannock they are adjusted by ×0.97, the factor we use across West Midlands.

Extension typeExample sizeStandard spec (inc VAT)
Extensions over a garage12 m²£24,000 – £31,500
Conservatory replacement extensions14 m²£29,000 – £37,500
Kitchen extensions20 m²£40,500 – £51,500
Single-storey rear extensions20 m²£39,500 – £50,500
Wraparound extensions25 m²£55,500 – £70,500
Double-storey extensions32 m²£55,500 – £73,000
Orangery extensions16 m²£43,000 – £54,500

Covering Cannock and nearby

Site visits are available across Cannock (WS6, WS11, WS12). We also work in nearby Great Wyrley (2 miles), Burntwood (4 miles), Rugeley (6 miles), Lichfield (9 miles), Stafford (9 miles). Just over the West Midlands border, Bloxwich is about 5 miles away.

What works best for Cannock houses?

Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.

The types we would usually look at first for a home in Cannock are kitchen extensions, single-storey rear extensions and extensions over a garage, depending on the garden and how the house is laid out.

Do extensions in Cannock need planning permission?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions about extensions in Cannock

How much does an extension cost in Cannock?

Using our West Midlands factor (×0.97), a standard-spec single-storey extension of 20 m² is a guide £39,500 to £50,500 including VAT, and a 32 m² two-storey extension £55,500 to £73,000. Your written price follows the survey.

Do you handle building regulations?

Yes. We prepare the drawings and calculations, submit them and book inspections, ending with a completion certificate.

Do I need planning permission for an extension in Cannock?

Not always. It depends on the size, position and your property's history. Many single-storey rear extensions in England are permitted development or can use prior approval.

Who do I contract with?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Book a free site visit in Cannock

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote