house-extension.uk

Kitchen extensions in Dukinfield: design, approvals and build

Dukinfield homeowners can use us for the whole kitchen extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in DukinfieldFrom £25,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time10–16 weeks on site
  • Postcode districtsM34, OL6, OL7, SK15, SK16
Kitchen extension with a navy island, flat rooflights and sliding doors to the garden

Covering Dukinfield

We cover Dukinfield and the postcode districts M34, OL6, OL7, SK15, SK16. We also work in nearby Ashton-under-Lyne (1 mile), Stalybridge (1 mile), Hyde (2 miles), Denton (2 miles).

The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.

Who a kitchen extension suits

  • Small or closed-off kitchens
  • Families who want cooking, dining and living together
  • Homes being prepared for sale or a long-term stay

Guide prices for Dukinfield

Prices below are for Dukinfield, using the North West England factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Dukinfield: £1,710 to £3,320 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£25,500 – £30,000£29,500 – £38,000£37,500 – £50,000
4 m × 5 m
20 m²
£34,000 – £40,000£39,500 – £50,500£50,000 – £66,500
4 m × 7 m
28 m²
£47,500 – £56,000£55,500 – £70,500£70,000 – £93,500

Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.

For a figure based on your own dimensions, use our guide-price tool.

Do I need planning permission in Dukinfield?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Your questions about a kitchen extension in Dukinfield

Do you cover all of Dukinfield?

Yes. We cover Dukinfield and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.

Do I need building regulations approval in Dukinfield?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a kitchen extension take to build in Dukinfield?

On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Where should the island go?

Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.

Can you fit a kitchen I buy elsewhere?

Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.

Book a free site visit in Dukinfield

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote