Glass box extensions across York
Planning a glass extension in York? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in YorkFrom £28,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsYO1, YO10, YO23, YO24, YO30

Is a glass extension right for your house?
- Small infill spaces and side returns
- Garden-facing dining rooms
- Period and listed-style houses where a light touch is wanted
Solar gain is the risk. We specify solar-control glass, plan for opening vents or sliding panels, and avoid fully glazed roofs on south-facing extensions unless shading is included.
Working in York
Our survey diary covers York, including YO1, YO10, YO23, YO24, YO30, YO31. The same team covers Selby (12 miles), Harrogate (19 miles), Ripon (24 miles), Northallerton (31 miles), all within easy reach.
For homes towards East Riding of Yorkshire, Goole is around 19 miles away. Yorkshire and the Humber combines stone-built terraces in the Pennine towns with brick semis and newer estates elsewhere, so materials and roof details need matching with care.
Do I need planning permission in York?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What should I budget for a glass extension in York?
These guide figures apply our Yorkshire and the Humber adjustment (×0.94) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in York: £2,820 to £5,450 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 2 m × 4 m 8 m² | £28,000 – £34,000 | £28,000 – £35,500 | £32,000 – £44,000 |
| 3 m × 4 m 12 m² | £33,500 – £41,000 | £39,000 – £50,000 | £48,500 – £65,500 |
| 3 m × 6 m 18 m² | £50,500 – £61,000 | £59,000 – £74,500 | £72,500 – £98,500 |
For a figure based on your own dimensions, use our guide-price tool.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about glass extensions
How long does a glass extension take to build in York?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Who do I contract with for a glass extension in York?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in York?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Are glass extensions cold in winter?
Modern double or triple glazing with warm-edge spacers and underfloor heating keeps them comfortable. They are not as warm as a solid room, and we explain the trade-off honestly.
How much does a glass extension cost?
Our guide range is about £2,820 to £5,450 per m² including VAT, because structural glass is made to order. A 12 m² standard-spec glass extension is typically £39,000 to £50,000 in York.
Book a free site visit in York
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.