York kitchen extensions, designed and built
We design and build kitchen extensions for houses in York, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in YorkFrom £25,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time10–16 weeks on site
- Postcode districtsYO1, YO10, YO23, YO24, YO30

Working in York
Across YO1, YO10, YO23, YO24, YO30, YO31, we can visit, measure and advise. We also work in nearby Selby (12 miles), Harrogate (19 miles), Ripon (24 miles), Northallerton (31 miles).
Yorkshire and the Humber combines stone-built terraces in the Pennine towns with brick semis and newer estates elsewhere, so materials and roof details need matching with care.
How much does a kitchen extension cost in York?
Prices below are for York, using the Yorkshire and the Humber factor of ×0.94. They are guide ranges including VAT for the build only, not a quote.
Typical rates in York: £1,690 to £3,290 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £25,000 – £30,000 | £29,500 – £37,500 | £37,000 – £49,500 |
| 4 m × 5 m 20 m² | £33,500 – £39,500 | £39,000 – £50,000 | £49,500 – £66,000 |
| 4 m × 7 m 28 m² | £47,000 – £55,500 | £55,000 – £70,000 | £69,500 – £92,500 |
Build cost only. A mid-range kitchen, supplied and fitted, typically adds £9,000 to £20,000.
Try the guide-price tool to see a range for your own size and finish.
What is included
- Wide sliding or bifold doors to the garden
- Extraction routes and ventilation for building regulations
- Kitchen-led layout planning before the drawings are fixed
- Kitchen fitting by our team or coordination with your supplier
- Drainage and services designed for sinks, island and appliances
- Roof lantern or rooflights positioned over the work zones
Planning rules that apply in York
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
The planning position for a specific York address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in York
Do you cover all of York?
Yes. We cover York and the surrounding parts of North Yorkshire. Site visits are free and there is no obligation.
How long does a kitchen extension take to build in York?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Do I need building regulations approval in York?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can you fit a kitchen I buy elsewhere?
Yes. We can fit it or work with your supplier’s fitters. We need the layout early so that drains, services and lighting are in the right place.
Where should the island go?
Usually under the brightest part of the roof and away from the main walkway to the garden. We test two or three layouts on the plan before deciding.
Book a free site visit in York
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.