house-extension.uk

Building regulations for extensions across Stourbridge

We prepare building regulations for extensions for homes in Stourbridge, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in StourbridgeFrom £850 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsB63, B64, DY5, DY6, DY8
Builder installing a steel beam over a new rear opening on acrow props

When it helps

  • Every extension, whatever the planning route
  • Glass-heavy designs that need energy calculations
  • Homeowners using their own builder who need the drawings

Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.

Extensions in and around Stourbridge

Postcode districts we cover around Stourbridge include B63, B64, DY5, DY6, DY8, DY9. We also work in nearby Brierley Hill (2 miles), Kingswinford (3 miles), Dudley (4 miles), Halesowen (4 miles).

Kidderminster, in Worcestershire, is roughly 7 miles from Stourbridge and also on our list. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.

Planning and approvals in Stourbridge

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Fees in Stourbridge

These are guide fees for Stourbridge, adjusted for West Midlands (×0.97) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£850 – £1,750
StandardDrawings plus structural calculations£1,250 – £2,550
PremiumComplex or two-storey pack with energy calculations£2,100 – £3,700

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Want a range for your exact size? The guide-price tool takes about a minute.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Common questions in Stourbridge

Do you cover all of Stourbridge?

Yes. We cover Stourbridge and the surrounding parts of West Midlands. Site visits are free and there is no obligation.

How long does this take for a Stourbridge home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Do I need building regulations approval in Stourbridge?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Stourbridge

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote