Building regulations for extensions across Brierley Hill
For Brierley Hill homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.
- Guide price in Brierley HillFrom £850 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsB64, DY2, DY5, DY6, DY8

When it helps
- Homeowners using their own builder who need the drawings
- Glass-heavy designs that need energy calculations
- Every extension, whatever the planning route
Design and approval fees for Brierley Hill
These are guide fees for Brierley Hill, adjusted for West Midlands (×0.97) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,750 |
| Standard | Drawings plus structural calculations | £1,250 – £2,550 |
| Premium | Complex or two-storey pack with energy calculations | £2,100 – £3,700 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
Do I need planning permission in Brierley Hill?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Extensions in and around Brierley Hill
Our survey diary covers Brierley Hill, including B64, DY2, DY5, DY6, DY8. Nearby, we also take on projects in Stourbridge (2 miles), Dudley (2 miles), Kingswinford (2 miles), Halesowen (4 miles).
Just over the Worcestershire border, Kidderminster is about 8 miles away. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Brierley Hill home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Brierley Hill
Do you cover all of Brierley Hill?
Yes. We cover Brierley Hill and the surrounding parts of West Midlands. Site visits are free and there is no obligation.
Do I need building regulations approval in Brierley Hill?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does this take for a Brierley Hill home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Brierley Hill
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.