Orangery extensions in Stourbridge
Our design and build teams take on orangery extensions in Stourbridge, from the first measured survey through planning and building control to the finished room.
- Guide price in StourbridgeFrom £29,000 inc VAT
- PlanningSame limits as single-storey rear; glazing checked for building regs
- Build time10–16 weeks on site
- Postcode districtsB63, B64, DY5, DY6, DY8

How much does an orangery extension cost in Stourbridge?
For Stourbridge we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Stourbridge: £2,330 to £4,360 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m 12 m² | £29,000 – £35,500 | £32,500 – £41,000 | £39,500 – £52,500 |
| 4 m × 4 m 16 m² | £37,000 – £45,500 | £43,000 – £54,500 | £52,500 – £70,000 |
| 4 m × 6 m 24 m² | £55,500 – £68,000 | £65,000 – £81,500 | £79,000 – £105,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Is an orangery extension right for your house?
- Homeowners replacing an older conservatory
- Period and detached houses with a garden view
- Those who want daylight without overheating
The lantern-to-roof ratio sets the character. A wider solid perimeter gives a calmer, more room-like space and hides downlights and speakers; a bigger lantern feels brighter but needs more care against summer heat.
Working in Stourbridge
We cover Stourbridge and the postcode districts B63, B64, DY5, DY6, DY8, DY9. Nearby, we also take on projects in Brierley Hill (2 miles), Kingswinford (3 miles), Dudley (4 miles), Halesowen (4 miles).
Just over the Worcestershire border, Kidderminster is about 7 miles away. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
Do I need planning permission in Stourbridge?
In England a glazed or orangery-style extension follows the same size limits as any single-storey rear extension: 3 m or 4 m without an application, or up to 6 m and 8 m through prior approval. Building regulations limit glazing to about a quarter of the new floor area plus the openings it replaces, unless whole-house calculations show the design still performs.
The planning position for a specific Stourbridge address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about orangery extensions
Will my neighbours in Stourbridge be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for an orangery extension in Stourbridge?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does an orangery extension take to build in Stourbridge?
On site, typically 10 to 16 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.
How much does an orangery cost?
Our guide range is about £2,330 to £4,360 per m² including VAT, so a 16 m² standard-spec orangery is typically £43,000 to £54,500 in Stourbridge.
Does an orangery need planning permission?
It follows the same size limits as other single-storey extensions. In England many fit within permitted development or prior approval; others need an application.
Book a free site visit in Stourbridge
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end