house-extension.uk

Building regulations for extensions across Maidenhead

We prepare building regulations for extensions for homes in Maidenhead, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in MaidenheadFrom £1,000 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsSL6
Builder installing a steel beam over a new rear opening on acrow props

What it costs in Maidenhead

Fees below are our Maidenhead guide (×1.12, the South East England factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,000 – £2,050
StandardDrawings plus structural calculations£1,450 – £2,950
PremiumComplex or two-storey pack with energy calculations£2,450 – £4,300

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

Want a range for your exact size? The guide-price tool takes about a minute.

Planning rules that apply in Maidenhead

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

The planning position for a specific Maidenhead address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • Building regulations drawings and written specification
  • Structural calculations for beams, lintels and foundations
  • Inspection bookings throughout the build
  • Submission to the council or a registered building control approver
  • Energy and glazing checks, including whole-house calculations if needed
  • Completion certificate on sign-off

Working in Maidenhead

Our survey diary covers Maidenhead, including SL6. Neighbouring towns we cover include Slough (5 miles), Windsor (6 miles), Bracknell (8 miles), Wokingham (9 miles).

Just over the Buckinghamshire border, Marlow is about 4 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions answered

How long does this take for a Maidenhead home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Maidenhead, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do you cover all of Maidenhead?

Yes. We cover Maidenhead and the surrounding parts of Berkshire. Site visits are free and there is no obligation.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in Maidenhead

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote