house-extension.uk

Utility and boot room extensions in Maidenhead

Planning a utility room extension in Maidenhead? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in MaidenheadFrom £15,500 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time6–10 weeks on site
  • Postcode districtsSL6
Utility and boot room with stacked washer and dryer, bench and coat hooks

Local to Maidenhead

Postcode districts we cover around Maidenhead include SL6. The same team covers Slough (5 miles), Windsor (6 miles), Bracknell (8 miles), Wokingham (9 miles), all within easy reach.

The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

Utility room extension prices in Maidenhead

Prices below are for Maidenhead, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Maidenhead: £2,130 to £3,920 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
2 m × 2.5 m
5 m²
£15,500 – £19,000£15,500 – £20,000£15,500 – £20,000
2.5 m × 3.2 m
8 m²
£17,000 – £20,500£20,000 – £25,500£25,000 – £31,500
3 m × 3.6 m
11 m²
£23,000 – £28,000£27,500 – £34,500£34,000 – £43,500

For a figure based on your own dimensions, use our guide-price tool.

Planning and approvals in Maidenhead

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Back door and a hard-wearing floor
  • Design around appliances, sink and storage
  • Ventilation for a tumble dryer
  • Built-in storage or space ready for your units
  • Waste and water connections

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Common questions in Maidenhead

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Maidenhead, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Will my neighbours in Maidenhead be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a utility room extension take to build in Maidenhead?

On site, typically 6 to 10 weeks once approvals are in place. Before that, allow 4–10 weeks design and approvals.

Does a utility extension need planning permission?

Often not, if it is single storey and within permitted development limits. We check this for your property.

Can a utility have a toilet?

Yes, space permitting. A WC needs drainage and extraction, which we plan into the design.

Book a free site visit in Maidenhead

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote