Building regulations for extensions across Berkshire
We prepare building regulations for extensions for homes across Berkshire, on their own or as the first stage of a full design and build project.
- Guide priceFrom £1,000 inc VAT
- Approval routeFull plans or building notice
- Towns covered11
- Site visitFree, no obligation

Towns in Berkshire
What we take care of
- Inspection bookings throughout the build
- Building regulations drawings and written specification
- Completion certificate on sign-off
- Structural calculations for beams, lintels and foundations
- Submission to the council or a registered building control approver
Extensions in and around Berkshire
Towns we cover in Berkshire include Reading, Slough, Bracknell, Maidenhead, Wokingham, Newbury, Earley, Windsor. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
What it costs in Berkshire
Guide fees for Berkshire including VAT, using our South East England factor of ×1.12. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,000 – £2,050 |
| Standard | Drawings plus structural calculations | £1,450 – £2,950 |
| Premium | Complex or two-storey pack with energy calculations | £2,450 – £4,300 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
For a figure based on your own dimensions, use our guide-price tool.
Planning and approvals in Berkshire
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Berkshire
Will my neighbours in Berkshire be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with in Berkshire?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Berkshire?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Book a free site visit in Berkshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.