house-extension.uk

Building regulations for extensions across Hornchurch

For Hornchurch homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.

  • Guide price in HornchurchFrom £1,150 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsRM1, RM2, RM11, RM12, RM14
Builder installing a steel beam over a new rear opening on acrow props

What it costs in Hornchurch

Fees below are our Hornchurch guide (×1.3, the London factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,150 – £2,350
StandardDrawings plus structural calculations£1,650 – £3,400
PremiumComplex or two-storey pack with energy calculations£2,850 – £4,950

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

For a figure based on your own dimensions, use our guide-price tool.

Working in Hornchurch

Our survey diary covers Hornchurch, including RM1, RM2, RM11, RM12, RM14. The same team covers Romford (2 miles), Dagenham (2 miles), Becontree (4 miles), Thamesmead (6 miles), all within easy reach.

For homes towards Essex, South Ockendon is around 4 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Will the council need to approve it?

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

The planning position for a specific Hornchurch address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • Building regulations drawings and written specification
  • Energy and glazing checks, including whole-house calculations if needed
  • Completion certificate on sign-off
  • Inspection bookings throughout the build
  • Submission to the council or a registered building control approver

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Hornchurch home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions answered

Do you cover all of Hornchurch?

Yes. We cover Hornchurch and the surrounding parts of Greater London. Site visits are free and there is no obligation.

How long does this take for a Hornchurch home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Hornchurch, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in Hornchurch

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote