house-extension.uk

Building regulations for extensions in Thamesmead

For Thamesmead homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.

  • Guide price in ThamesmeadFrom £1,150 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsDA17, DA18, IG11, SE2, SE18
Builder installing a steel beam over a new rear opening on acrow props

Covering Thamesmead

Across DA17, DA18, IG11, SE2, SE18, SE28, we can visit, measure and advise. We also work in nearby Abbey Wood (1 mile), Plumstead (2 miles), Barking (3 miles), Welling (3 miles).

Dartford, in Kent, is roughly 6 miles from Thamesmead and also on our list. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Planning rules that apply in Thamesmead

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What it costs in Thamesmead

These are guide fees for Thamesmead, adjusted for London (×1.3) and including VAT. Council application and inspection fees are paid separately.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,150 – £2,350
StandardDrawings plus structural calculations£1,650 – £3,400
PremiumComplex or two-storey pack with energy calculations£2,850 – £4,950

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

For a figure based on your own dimensions, use our guide-price tool.

When it helps

  • Glass-heavy designs that need energy calculations
  • Homeowners using their own builder who need the drawings
  • Every extension, whatever the planning route

Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Thamesmead

Do you cover all of Thamesmead?

Yes. We cover Thamesmead and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Do I need building regulations approval in Thamesmead?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does this take for a Thamesmead home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

What are the insulation standards for an extension?

In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.

Book a free site visit in Thamesmead

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote