Building regulations for extensions across Brecon
We prepare building regulations for extensions for homes in Brecon, as a stand-alone service or as the first stage of a design and build project.
- Guide price in BreconFrom £800 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsLD3

What is included
- Energy and glazing checks, including whole-house calculations if needed
- Submission to the council or a registered building control approver
- Inspection bookings throughout the build
- Building regulations drawings and written specification
- Structural calculations for beams, lintels and foundations
- Completion certificate on sign-off
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
What it costs in Brecon
These are guide fees for Brecon, adjusted for Wales (×0.93) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £800 – £1,700 |
| Standard | Drawings plus structural calculations | £1,200 – £2,450 |
| Premium | Complex or two-storey pack with energy calculations | £2,000 – £3,550 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Welsh Government.
Want a range for your exact size? The guide-price tool takes about a minute.
Extensions in and around Brecon
Across LD3, we can visit, measure and advise. Nearby, we also take on projects in Llandrindod Wells (21 miles), Newtown (39 miles), Welshpool (49 miles).
Ebbw Vale, in Gwent, is roughly 14 miles from Brecon and also on our list. Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.
Do I need planning permission in Brecon?
Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.
Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Brecon
Do you cover all of Brecon?
Yes. We cover Brecon and the surrounding parts of Powys. Site visits are free and there is no obligation.
Will my neighbours in Brecon be involved?
If a planning application is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Brecon?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Book a free site visit in Brecon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.