house-extension.uk

Building regulations for extensions across Welshpool

We prepare building regulations for extensions for homes in Welshpool, as a stand-alone service or as the first stage of a design and build project.

  • Guide price in WelshpoolFrom £800 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsSY21
Builder installing a steel beam over a new rear opening on acrow props

What is included

  • Building regulations drawings and written specification
  • Completion certificate on sign-off
  • Energy and glazing checks, including whole-house calculations if needed
  • Structural calculations for beams, lintels and foundations
  • Submission to the council or a registered building control approver

Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.

Working in Welshpool

Across SY21, we can visit, measure and advise. Nearby, we also take on projects in Newtown (11 miles), Llandrindod Wells (28 miles), Brecon (49 miles).

In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.

Do I need planning permission in Welshpool?

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

The planning position for a specific Welshpool address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

Fees in Welshpool

Fees below are our Welshpool guide (×0.93, the Wales factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£800 – £1,700
StandardDrawings plus structural calculations£1,200 – £2,450
PremiumComplex or two-storey pack with energy calculations£2,000 – £3,550

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Welsh Government.

Try the guide-price tool to see a range for your own size and finish.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Welshpool

Do you cover all of Welshpool?

Yes. We cover Welshpool and the surrounding parts of Powys. Site visits are free and there is no obligation.

How long does this take for a Welshpool home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Will my neighbours in Welshpool be involved?

If a planning application is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in Welshpool

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote