Building regulations for extensions across Buckinghamshire
We prepare building regulations for extensions for homes across Buckinghamshire, on their own or as the first stage of a full design and build project.
- Guide priceFrom £1,000 inc VAT
- Approval routeFull plans or building notice
- Towns covered9
- Site visitFree, no obligation

Towns in Buckinghamshire
Do I need planning permission in Buckinghamshire?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Fees in Buckinghamshire
Guide fees for Buckinghamshire including VAT, using our South East England factor of ×1.12. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £1,000 – £2,050 |
| Standard | Drawings plus structural calculations | £1,450 – £2,950 |
| Premium | Complex or two-storey pack with energy calculations | £2,450 – £4,300 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
What we take care of
- Inspection bookings throughout the build
- Completion certificate on sign-off
- Energy and glazing checks, including whole-house calculations if needed
- Building regulations drawings and written specification
- Submission to the council or a registered building control approver
- Structural calculations for beams, lintels and foundations
Covering Buckinghamshire
Towns we cover in Buckinghamshire include Milton Keynes, High Wycombe, Aylesbury, Bletchley, Amersham, Chesham, Gerrards Cross, Chalfont St Peter. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Buckinghamshire
Do you cover all of Buckinghamshire?
Yes, across the whole of Buckinghamshire. Site visits are free and there is no obligation.
Do I need building regulations approval in Buckinghamshire?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Buckinghamshire be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Book a free site visit in Buckinghamshire
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.