Double-storey extensions for homes in Washington
Our design and build teams take on double-storey extensions in Washington, from the first measured survey through planning and building control to the finished room.
- Guide price in WashingtonFrom £34,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsDH4, NE9, NE10, NE37, NE38

Guide prices for Washington
For Washington we adjust our national guide rates by ×0.91, the factor we use for North East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Washington: £1,410 to £2,730 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £34,500 – £41,500 | £39,000 – £51,500 | £50,000 – £66,000 |
| 4 m × 4 m, two floors 32 m² | £45,000 – £54,000 | £52,000 – £68,500 | £66,500 – £87,500 |
| 4 m × 6 m, two floors 48 m² | £67,500 – £81,000 | £78,500 – £103,000 | £100,000 – £131,500 |
Try the guide-price tool to see a range for your own size and finish.
Working in Washington
Postcode districts we cover around Washington include DH4, NE9, NE10, NE37, NE38, SR4. Neighbouring towns we cover include Felling (4 miles), Houghton-le-Spring (5 miles), Hebburn (5 miles), Sunderland (5 miles).
The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.
What is included
- Insulation, plastering, electrics and plumbing to finish
- Ground and first floor structure, roof tied into the existing roof
- Measured survey, design and planning drawings
- Breaking through at both levels, stairs and landing changes where needed
- Building regulations drawings and structural design
- Householder planning application where needed
The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.
Will the council need to approve it?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Washington
Do you cover all of Washington?
Yes. We cover Washington and the surrounding parts of Tyne and Wear. Site visits are free and there is no obligation.
Will my neighbours in Washington be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does a double-storey extension take to build in Washington?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Washington
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.