Double-storey extensions for homes in Felling
Felling homeowners can use us for the whole double-storey extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in FellingFrom £34,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsNE1, NE6, NE8, NE9, NE10

Extensions in and around Felling
We cover Felling and the postcode districts NE1, NE6, NE8, NE9, NE10, NE99. Neighbouring towns we cover include Gateshead (1 mile), Newcastle upon Tyne (2 miles), Hebburn (3 miles), Wallsend (3 miles).
Just over the County Durham border, Chester-le-Street is about 7 miles away. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.
Double-storey extension prices in Felling
Prices below are for Felling, using the North East England factor of ×0.91. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Felling: £1,410 to £2,730 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £34,500 – £41,500 | £39,000 – £51,500 | £50,000 – £66,000 |
| 4 m × 4 m, two floors 32 m² | £45,000 – £54,000 | £52,000 – £68,500 | £66,500 – £87,500 |
| 4 m × 6 m, two floors 48 m² | £67,500 – £81,000 | £78,500 – £103,000 | £100,000 – £131,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Felling
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Insulation, plastering, electrics and plumbing to finish
- Ground and first floor structure, roof tied into the existing roof
- Householder planning application where needed
- Breaking through at both levels, stairs and landing changes where needed
- Building regulations drawings and structural design
The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Felling
Do you cover all of Felling?
Yes. We cover Felling and the surrounding parts of Tyne and Wear. Site visits are free and there is no obligation.
Do I need building regulations approval in Felling?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Felling be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Felling
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.