house-extension.uk

Double-storey extensions in Houghton-le-Spring

We design and build double-storey extensions for houses in Houghton-le-Spring, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in Houghton-le-SpringFrom £34,500 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsDH4, DH5
Two-storey rear extension on a brick semi-detached house with a hipped roof

How much does a double-storey extension cost in Houghton-le-Spring?

For Houghton-le-Spring we adjust our national guide rates by ×0.91, the factor we use for North East England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Houghton-le-Spring: £1,410 to £2,730 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£34,500 – £41,500£39,000 – £51,500£50,000 – £66,000
4 m × 4 m, two floors
32 m²
£45,000 – £54,000£52,000 – £68,500£66,500 – £87,500
4 m × 6 m, two floors
48 m²
£67,500 – £81,000£78,500 – £103,000£100,000 – £131,500

For a figure based on your own dimensions, use our guide-price tool.

Do I need planning permission in Houghton-le-Spring?

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

The planning position for a specific Houghton-le-Spring address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Is a double-storey extension right for your house?

  • Houses with enough distance to the rear or side boundary
  • Growing families who need a bedroom as well as a bigger kitchen
  • Homeowners who would otherwise consider moving

Working in Houghton-le-Spring

Our survey diary covers Houghton-le-Spring, including DH4, DH5. Nearby, we also take on projects in Washington (5 miles), Sunderland (6 miles), Felling (9 miles), Hebburn (9 miles).

The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about double-storey extensions

Do you cover all of Houghton-le-Spring?

Yes. We cover Houghton-le-Spring and the surrounding parts of Tyne and Wear. Site visits are free and there is no obligation.

Will my neighbours in Houghton-le-Spring be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Houghton-le-Spring, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Book a free site visit in Houghton-le-Spring

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote