house-extension.uk

Double-storey extensions in Tamworth

Tamworth homeowners can use us for the whole double-storey extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in TamworthFrom £36,500 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsB77, B78, B79
Two-storey rear extension on a brick semi-detached house with a hipped roof

What we take care of

  • Householder planning application where needed
  • Measured survey, design and planning drawings
  • Breaking through at both levels, stairs and landing changes where needed
  • Ground and first floor structure, roof tied into the existing roof
  • Foundations sized for two floors
  • Building regulations drawings and structural design

Extensions in and around Tamworth

Across B77, B78, B79, we can visit, measure and advise. The same team covers Lichfield (6 miles), Burntwood (10 miles), Burton upon Trent (12 miles), Rugeley (13 miles), all within easy reach.

Just over the Warwickshire border, Atherstone is about 7 miles away. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.

Do I need planning permission in Tamworth?

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Guide prices for Tamworth

Prices below are for Tamworth, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Tamworth: £1,500 to £2,910 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£36,500 – £44,000£41,500 – £55,000£53,500 – £70,000
4 m × 4 m, two floors
32 m²
£48,000 – £57,500£55,500 – £73,000£71,000 – £93,500
4 m × 6 m, two floors
48 m²
£72,000 – £86,500£83,500 – £109,500£107,000 – £140,000

For a figure based on your own dimensions, use our guide-price tool.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Tamworth home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Double-storey extension questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Tamworth, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a double-storey extension take to build in Tamworth?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Who do I contract with for a double-storey extension in Tamworth?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Book a free site visit in Tamworth

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote