house-extension.uk

Side return extensions in Tamworth: design, approvals and build

Our design and build teams take on side return extensions in Tamworth, from the first measured survey through planning and building control to the finished room.

  • Guide price in TamworthFrom £17,000 inc VAT
  • PlanningOften permitted development; party wall notice usual
  • Build time10–14 weeks on site
  • Postcode districtsB77, B78, B79
Side return extension on a Victorian terrace with a sloping glass roof over the kitchen

Side return extension prices in Tamworth

Prices below are for Tamworth, using the West Midlands factor of ×0.97. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Tamworth: £2,040 to £3,690 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
1.8 m × 4.5 m
8 m²
£17,000 – £21,000£18,500 – £23,500£23,000 – £29,500
2 m × 5.5 m
11 m²
£22,000 – £27,000£25,500 – £32,500£32,000 – £41,000
2.2 m × 7 m
15 m²
£30,500 – £36,500£34,500 – £44,000£43,500 – £55,500

Try the guide-price tool to see a range for your own size and finish.

Working in Tamworth

Across B77, B78, B79, we can visit, measure and advise. Neighbouring towns we cover include Lichfield (6 miles), Burntwood (10 miles), Burton upon Trent (12 miles), Rugeley (13 miles).

The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

Planning and approvals in Tamworth

In England a single-storey side return infill is often permitted development if it stays within the height limits and is no wider than half the width of the original house. Conservation areas, listed buildings and flats always need an application, and the boundary wall usually brings in the Party Wall Act.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

When a side return extension makes sense

  • Homes where the garden is too small to lose much depth
  • Victorian and Edwardian terraces with a rear outrigger
  • Narrow galley kitchens

Light is the design problem. A side return can make the middle of the house darker if the roof is solid, so we model the daylight and usually recommend a glazed slope or a run of rooflights along the boundary edge.

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Side return extension questions answered

Who do I contract with for a side return extension in Tamworth?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a side return extension take to build in Tamworth?

On site, typically 10 to 14 weeks once approvals are in place. Before that, allow 6–12 weeks design and approvals.

Do you cover all of Tamworth?

Yes. We cover Tamworth and the surrounding parts of Staffordshire. Site visits are free and there is no obligation.

Can I combine a side return with a rear extension?

Yes. That combination is a wraparound extension, which adds the most space to a terraced house.

Do side return extensions need planning permission?

In England many single-storey side returns fit within permitted development if they stay within the height limits and are no wider than half the width of the original house. Conservation areas, listed buildings and flats need an application. Other UK nations have their own rules, which we check.

Book a free site visit in Tamworth

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote