Newburn over-garage extensions, designed and built
Newburn homeowners can use us for the whole over-garage extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in NewburnFrom £21,500 inc VAT
- PlanningHouseholder application needed
- Build time12–18 weeks on site
- Postcode districtsNE5, NE15, NE21, NE40

Guide prices for Newburn
Prices below are for Newburn, using the North East England factor of ×0.91. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Newburn: £1,640 to £3,090 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Over a single garage 12 m² | £21,500 – £27,000 | £22,500 – £29,500 | £29,000 – £37,500 |
| Over a large single garage 16 m² | £26,000 – £32,500 | £30,500 – £39,500 | £39,000 – £50,000 |
| Over a double garage 24 m² | £39,000 – £48,500 | £45,500 – £59,000 | £58,500 – £74,500 |
For a figure based on your own dimensions, use our guide-price tool.
Local to Newburn
Postcode districts we cover around Newburn include NE5, NE15, NE21, NE40. Neighbouring towns we cover include Gosforth (5 miles), Newcastle upon Tyne (5 miles), Gateshead (6 miles), Felling (7 miles).
Just over the County Durham border, Stanley is about 8 miles away. The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.
Who an over-garage extension suits
- Homes where the landing can connect to the new room
- Detached and link-detached houses with an attached garage
- Families needing a bedroom without losing garden
Fitting the new room to the existing landing is the planning puzzle inside the house. We design the connection first, then the roof, so the extension does not end up with awkward steps or a corridor through a bedroom.
Planning and approvals in Newburn
In England any side extension over one storey, including a room built over a side garage, needs a householder planning application. The fee is £548 from 1 April 2026 and councils aim to decide within 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about an over-garage extension in Newburn
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Newburn, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Newburn?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Newburn?
Yes. We cover Newburn and the surrounding parts of Tyne and Wear. Site visits are free and there is no obligation.
Can I keep using the garage during the build?
Usually not for parking. The garage roof is removed and the space below is used for access and props for part of the build.
Does building over a garage need planning permission?
In England and the rest of the UK, adding a storey over a side garage almost always needs a planning application, because two-storey side extensions are outside permitted development.
Book a free site visit in Newburn
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.