house-extension.uk

Double-storey extensions in Hyde

We design and build double-storey extensions for houses in Hyde, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in HydeFrom £36,000 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsM34, SK14, SK16
Two-storey rear extension on a brick semi-detached house with a hipped roof

Working in Hyde

We cover Hyde and the postcode districts M34, SK14, SK16. Nearby, we also take on projects in Denton (2 miles), Dukinfield (2 miles), Stalybridge (2 miles), Ashton-under-Lyne (3 miles).

Just over the Cheshire border, Wilmslow is about 11 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.

Is a double-storey extension right for your house?

  • Houses with enough distance to the rear or side boundary
  • Homeowners who would otherwise consider moving
  • Growing families who need a bedroom as well as a bigger kitchen

Guide prices for Hyde

These guide figures apply our North West England adjustment (×0.95) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Hyde: £1,470 to £2,850 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£36,000 – £43,500£41,000 – £54,000£52,000 – £68,500
4 m × 4 m, two floors
32 m²
£47,000 – £56,500£54,500 – £71,500£69,500 – £91,500
4 m × 6 m, two floors
48 m²
£70,500 – £84,500£82,000 – £107,500£104,500 – £137,000

Try the guide-price tool to see a range for your own size and finish.

Planning rules that apply in Hyde

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

The planning position for a specific Hyde address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Hyde home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Hyde

Do I need building regulations approval in Hyde?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a double-storey extension take to build in Hyde?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Who do I contract with for a double-storey extension in Hyde?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Is a two-storey extension cheaper per square metre?

Usually. Our guide range is about £1,470 to £2,850 per m² of new floor area including VAT, compared with £1,660 to £3,230 per m² for single-storey work, because the foundations and roof are shared across two floors.

Book a free site visit in Hyde

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote