Building regulations for extensions across Hyde
We prepare building regulations for extensions for homes in Hyde, as a stand-alone service or as the first stage of a design and build project.
- Guide price in HydeFrom £850 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsM34, SK14, SK16

What is included
- Building regulations drawings and written specification
- Structural calculations for beams, lintels and foundations
- Completion certificate on sign-off
- Submission to the council or a registered building control approver
- Inspection bookings throughout the build
- Energy and glazing checks, including whole-house calculations if needed
Extensions in and around Hyde
Postcode districts we cover around Hyde include M34, SK14, SK16. The same team covers Denton (2 miles), Dukinfield (2 miles), Stalybridge (2 miles), Ashton-under-Lyne (3 miles), all within easy reach.
Just over the Cheshire border, Wilmslow is about 11 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
Planning rules that apply in Hyde
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Fees in Hyde
Guide fees for Hyde including VAT, using our North West England factor of ×0.95. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,750 |
| Standard | Drawings plus structural calculations | £1,200 – £2,500 |
| Premium | Complex or two-storey pack with energy calculations | £2,050 – £3,650 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Hyde
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Hyde, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Hyde?
Yes. We cover Hyde and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.
Do I need building regulations approval in Hyde?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
What are the insulation standards for an extension?
In England, new walls in an extension should achieve a U-value of 0.18 W/m²K, roofs 0.15 and floors 0.18, with windows at 1.4 and rooflights at 2.2. Wales, Scotland and Northern Ireland set their own figures.
Book a free site visit in Hyde
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.