house-extension.uk

Dunstable bungalow extensions, designed and built

A bungalow extension in Dunstable starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in DunstableFrom £27,500 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsLU4, LU5, LU6
Bungalow with a rear extension in matching brick and wide glazed doors

When a bungalow extension makes sense

  • Homeowners planning for later life
  • Families wanting more space on one floor
  • Bungalows on larger plots

Planning rules that apply in Dunstable

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Extensions in and around Dunstable

We cover Dunstable and the postcode districts LU4, LU5, LU6. Nearby, we also take on projects in Luton (5 miles), Leighton Buzzard (6 miles), Ampthill (10 miles), Kempston (16 miles).

Harpenden, in Hertfordshire, is roughly 9 miles from Dunstable and also on our list. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

What should I budget for a bungalow extension in Dunstable?

Prices below are for Dunstable, using the East of England factor of ×1.06. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Dunstable: £1,860 to £3,600 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£27,500 – £33,500£32,500 – £42,500£41,000 – £54,500
4 m × 6 m
24 m²
£44,500 – £53,500£52,000 – £67,500£66,000 – £86,500
L-shape
35 m²
£64,500 – £78,000£76,000 – £98,500£96,000 – £126,500

Want a range for your exact size? The guide-price tool takes about a minute.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Dunstable home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Dunstable

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Dunstable, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Will my neighbours in Dunstable be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a bungalow extension take to build in Dunstable?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Book a free site visit in Dunstable

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote