Bedroom extensions in Dunstable: design, approvals and build
A bedroom extension in Dunstable starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in DunstableFrom £27,500 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsLU4, LU5, LU6

What should I budget for a bedroom extension in Dunstable?
These guide figures apply our East of England adjustment (×1.06) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Dunstable: £1,700 to £3,390 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £27,500 – £34,000 | £27,500 – £36,000 | £30,500 – £41,000 |
| Bedroom and en-suite 18 m² | £30,500 – £37,500 | £36,000 – £47,000 | £45,500 – £61,500 |
| Two rooms 30 m² | £50,500 – £62,500 | £60,000 – £78,000 | £76,000 – £102,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Working in Dunstable
Across LU4, LU5, LU6, we can visit, measure and advise. The same team covers Luton (5 miles), Leighton Buzzard (6 miles), Ampthill (10 miles), Kempston (16 miles), all within easy reach.
Harpenden, in Hertfordshire, is roughly 9 miles from Dunstable and also on our list. The East of England mixes market-town terraces, inter-war semis and modern estates. Clay soils are common in parts of the region, which can affect foundation design.
What is included
- Planning drawings and application
- Structure, roof, insulation and finish
- Layout options: two-storey, over-garage or ground floor
- Fire safety: escape windows and smoke alarms to building regulations
Planning and approvals in Dunstable
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Dunstable home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Your questions about a bedroom extension in Dunstable
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Dunstable, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Dunstable?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Dunstable be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Book a free site visit in Dunstable
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.