house-extension.uk

Kempston bungalow extensions, designed and built

A bungalow extension in Kempston starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in KempstonFrom £27,500 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsMK40, MK42
Bungalow with a rear extension in matching brick and wide glazed doors

Bungalow extension prices in Kempston

Labour and material costs vary across the UK, so for Kempston we use our East of England factor (×1.06). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Kempston: £1,860 to £3,600 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£27,500 – £33,500£32,500 – £42,500£41,000 – £54,500
4 m × 6 m
24 m²
£44,500 – £53,500£52,000 – £67,500£66,000 – £86,500
L-shape
35 m²
£64,500 – £78,000£76,000 – £98,500£96,000 – £126,500

Want a range for your exact size? The guide-price tool takes about a minute.

Extensions in and around Kempston

Our survey diary covers Kempston, including MK40, MK42. We also work in nearby Bedford (2 miles), Ampthill (6 miles), Leighton Buzzard (15 miles), Dunstable (16 miles).

Milton Keynes, in Buckinghamshire, is roughly 12 miles from Kempston and also on our list. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.

What is included

  • Structural survey before any upward extension
  • Single-storey extension options assessed first
  • Planning application where needed
  • Roof designs that tie into the existing hipped or gable roof
  • Level thresholds and accessible layouts

Planning and approvals in Kempston

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

The planning position for a specific Kempston address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Kempston home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Your questions about a bungalow extension in Kempston

Do I need building regulations approval in Kempston?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who do I contract with for a bungalow extension in Kempston?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a bungalow extension take to build in Kempston?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

How much does a bungalow extension cost?

Our guide range for single-storey work is about £1,860 to £3,600 per m² including VAT. Going upwards is priced after a structural survey.

Book a free site visit in Kempston

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote