house-extension.uk

Bungalow extensions in Arnold

Arnold homeowners can use us for the whole bungalow extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in ArnoldFrom £24,500 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsNG3, NG5, NG6
Bungalow with a rear extension in matching brick and wide glazed doors

Working in Arnold

Our survey diary covers Arnold, including NG3, NG5, NG6. Nearby, we also take on projects in Nottingham (3 miles), Hucknall (4 miles), West Bridgford (5 miles), Eastwood (7 miles).

The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

Bungalow extension prices in Arnold

Prices below are for Arnold, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Arnold: £1,660 to £3,230 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£24,500 – £30,000£29,000 – £38,000£37,000 – £48,500
4 m × 6 m
24 m²
£39,500 – £48,000£46,500 – £60,500£59,000 – £78,000
L-shape
35 m²
£58,000 – £70,000£68,000 – £88,500£86,000 – £113,500

Want a range for your exact size? The guide-price tool takes about a minute.

Included in a typical project

  • Structural survey before any upward extension
  • Roof designs that tie into the existing hipped or gable roof
  • Level thresholds and accessible layouts
  • Planning application where needed
  • Single-storey extension options assessed first

Bungalow roofs are often hipped, which makes tying in an extension roof a careful job. We draw the roof junction early because it drives both the look and the cost.

Do I need planning permission in Arnold?

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Your questions about a bungalow extension in Arnold

How long does a bungalow extension take to build in Arnold?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Will my neighbours in Arnold be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do you cover all of Arnold?

Yes. We cover Arnold and the surrounding parts of Nottinghamshire. Site visits are free and there is no obligation.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Book a free site visit in Arnold

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote