Extension plans and drawings across Arnold
For Arnold homeowners we handle extension plans and drawings, with fees agreed in writing before any work starts.
- Guide price in ArnoldFrom £1,100 inc VAT
- PlanningWe find the right route for you
- Timescale2–6 weeks for drawings
- Postcode districtsNG3, NG5, NG6

When it helps
- Homeowners at the very start of a project
- Projects that need a planning application or other approval
- Anyone who wants fixed designs before getting build prices
Covering Arnold
Postcode districts we cover around Arnold include NG3, NG5, NG6. The same team covers Nottingham (3 miles), Hucknall (4 miles), West Bridgford (5 miles), Eastwood (7 miles), all within easy reach.
The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
Planning and approvals in Arnold
In England the main routes are permitted development (ideally confirmed with a lawful development certificate, £274), larger home extension prior approval (£249, 42 days) and a householder planning application (£548, normally 8 weeks), with council fees as set from 1 April 2026.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Design and approval fees for Arnold
Guide fees for Arnold including VAT, using our East Midlands factor of ×0.95. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Measured survey and planning drawings | £1,100 – £2,100 |
| Standard | Planning drawings plus building regulations drawings | £2,050 – £3,650 |
| Premium | Full pack with structural calculations and 3D visuals | £3,200 – £5,250 |
Want a range for your exact size? The guide-price tool takes about a minute.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
Do I need building regulations approval in Arnold?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Arnold?
Yes. We cover Arnold and the surrounding parts of Nottinghamshire. Site visits are free and there is no obligation.
Who do I contract with in Arnold?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need an architect?
Not necessarily. For most extensions an experienced designer or architectural technologist is enough. For listed buildings or complex sites an architect’s input can help.
Can I use your drawings with another builder?
Yes. Once paid for, the drawings are yours to use for your project.
Book a free site visit in Arnold
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.