Bedroom extensions in Arnold: design, approvals and build
We design and build bedroom extensions for houses in Arnold, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in ArnoldFrom £24,500 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsNG3, NG5, NG6

What should I budget for a bedroom extension in Arnold?
Labour and material costs vary across the UK, so for Arnold we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Arnold: £1,520 to £3,040 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £24,500 – £30,500 | £24,500 – £32,000 | £27,000 – £36,500 |
| Bedroom and en-suite 18 m² | £27,000 – £33,500 | £32,000 – £42,000 | £41,000 – £55,000 |
| Two rooms 30 m² | £45,500 – £56,000 | £54,000 – £70,000 | £68,000 – £91,500 |
Try the guide-price tool to see a range for your own size and finish.
Covering Arnold
Our survey diary covers Arnold, including NG3, NG5, NG6. The same team covers Nottingham (3 miles), Hucknall (4 miles), West Bridgford (5 miles), Eastwood (7 miles), all within easy reach.
Just over the Derbyshire border, Ilkeston is about 8 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
Who a bedroom extension suits
- Growing families
- Homeowners who want an en-suite master bedroom
- Multi-generational households
Planning and approvals in Arnold
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Arnold
Who do I contract with for a bedroom extension in Arnold?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Will my neighbours in Arnold be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Arnold?
Yes. We cover Arnold and the surrounding parts of Nottinghamshire. Site visits are free and there is no obligation.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Book a free site visit in Arnold
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.