Stamford Hill bedroom extensions, designed and built
Planning a bedroom extension in Stamford Hill? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in Stamford HillFrom £33,500 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsE5, E8, N4, N5, N15

How much does a bedroom extension cost in Stamford Hill?
For Stamford Hill we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Stamford Hill: £2,080 to £4,160 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £33,500 – £41,500 | £33,500 – £44,000 | £37,000 – £50,000 |
| Bedroom and en-suite 18 m² | £37,000 – £46,000 | £44,000 – £57,500 | £56,000 – £75,000 |
| Two rooms 30 m² | £62,000 – £76,500 | £74,000 – £96,000 | £93,500 – £125,000 |
For a figure based on your own dimensions, use our guide-price tool.
What is included
- Fire safety: escape windows and smoke alarms to building regulations
- Structure, roof, insulation and finish
- Layout options: two-storey, over-garage or ground floor
- En-suite drainage and ventilation design
- Planning drawings and application
- Heating extended to the new rooms
New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.
Working in Stamford Hill
We cover Stamford Hill and the postcode districts E5, E8, N4, N5, N15, N16. Nearby, we also take on projects in Harringay (1 mile), Highbury (2 miles), Tottenham (2 miles), Holloway (2 miles).
In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
Planning and approvals in Stamford Hill
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Stamford Hill home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Bedroom extension questions answered
How long does a bedroom extension take to build in Stamford Hill?
On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Stamford Hill, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Stamford Hill?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Book a free site visit in Stamford Hill
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.