Double-storey extensions across Stamford Hill
Thinking about a double-storey extension for your Stamford Hill home? Start with a free site visit: we measure up, check what the council will allow and give you honest guide figures on the day.
- Guide price in Stamford HillFrom £49,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsE5, E8, N4, N5, N15

What should I budget for a double-storey extension in Stamford Hill?
Prices below are for Stamford Hill, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Stamford Hill: £2,020 to £3,900 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £49,000 – £59,000 | £56,000 – £73,500 | £71,500 – £94,000 |
| 4 m × 4 m, two floors 32 m² | £64,000 – £77,000 | £74,500 – £98,000 | £95,500 – £125,000 |
| 4 m × 6 m, two floors 48 m² | £96,500 – £115,500 | £112,000 – £147,000 | £143,500 – £187,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Planning rules that apply in Stamford Hill
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Local to Stamford Hill
Across E5, E8, N4, N5, N15, N16, we can visit, measure and advise. We also work in nearby Harringay (1 mile), Highbury (2 miles), Tottenham (2 miles), Holloway (2 miles).
Just over the Essex border, Waltham Abbey is about 9 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
When a double-storey extension makes sense
- Houses with enough distance to the rear or side boundary
- Homeowners who would otherwise consider moving
- Growing families who need a bedroom as well as a bigger kitchen
The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Stamford Hill
How long does a double-storey extension take to build in Stamford Hill?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Will my neighbours in Stamford Hill be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Stamford Hill?
Yes. We cover Stamford Hill and the surrounding parts of Greater London. Site visits are free and there is no obligation.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £2,020 to £3,900 per m² of new floor area including VAT, compared with £2,280 to £4,420 per m² for single-storey work, because the foundations and roof are shared across two floors.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Stamford Hill
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end