Annexe extensions in Chalk Farm: design, approvals and build
From the first sketch to final sign-off, we plan and build annexe extensions in Chalk Farm and the surrounding Greater London area.
- Guide price in Chalk FarmFrom £71,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsN1C, N7, NW1, NW3, NW5

Extensions in and around Chalk Farm
Site visits are available across Chalk Farm (N1C, N7, NW1, NW3, NW5, NW8). Neighbouring towns we cover include Camden Town (0 miles), Holloway (1 mile), Kilburn (2 miles), Highbury (2 miles).
In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
How much does an annexe extension cost in Chalk Farm?
For Chalk Farm we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Chalk Farm: £2,600 to £4,940 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Studio annexe 25 m² | £71,500 – £89,500 | £78,000 – £97,500 | £97,500 – £123,500 |
| One-bedroom annexe 35 m² | £91,000 – £114,000 | £109,000 – £136,500 | £136,500 – £173,000 |
| Larger annexe 45 m² | £117,000 – £146,500 | £140,000 – £175,500 | £175,500 – £222,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Will the council need to approve it?
In England an annexe that stays part of the household and connects to the house is assessed as an extension, but its size usually takes it beyond permitted development, so a householder application describing the ancillary use is the normal route.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Included in a typical project
- Fire separation and alarms to building regulations
- Design for accessibility: level thresholds, wider doors, walk-in shower
- Planning application describing ancillary use
- Separate or shared heating and hot water
- Kitchenette, shower room and bedroom finish
Accessibility is cheaper to design in than to retrofit. Level access, a 900 mm door width, a level-access shower and space to turn a wheelchair can all be planned into the footprint for little extra cost.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Chalk Farm
Who do I contract with for an annexe extension in Chalk Farm?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Chalk Farm?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does an annexe extension take to build in Chalk Farm?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 10–16 weeks design and approvals.
Can the annexe have its own front door?
Yes, many do, but it should still connect to the main house to stay clearly part of it.
How much does an annexe extension cost?
Our guide range is about £2,600 to £4,940 per m² including VAT. A one-bedroom annexe of about 35 m² is typically £109,000 to £136,500 at standard spec in Chalk Farm.
Book a free site visit in Chalk Farm
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.