Wraparound extensions in Swadlincote: design, approvals and build
Our design and build teams take on wraparound extensions in Swadlincote, from the first measured survey through planning and building control to the finished room.
- Guide price in SwadlincoteFrom £34,000 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsDE11

Included in a typical project
- Survey, design and 3D layout options
- Foundations, drainage and any manhole relocation
- Householder planning application
- Structural design for the corner and openings
- Party wall notice support (England and Wales)
- Full internal finish or kitchen-ready shell
Planning rules that apply in Swadlincote
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
The planning position for a specific Swadlincote address depends on its history and any designations, which is why we check it at the first visit.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Swadlincote
Our survey diary covers Swadlincote, including DE11. Neighbouring towns we cover include Derby (11 miles), Long Eaton (15 miles), Ilkeston (17 miles), Belper (18 miles).
Just over the Staffordshire border, Burton upon Trent is about 4 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
How much does a wraparound extension cost in Swadlincote?
For Swadlincote we adjust our national guide rates by ×0.95, the factor we use for East Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Swadlincote: £1,900 to £3,520 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £34,000 – £41,500 | £39,000 – £50,000 | £49,500 – £63,500 |
| Medium L-shape 25 m² | £47,500 – £57,000 | £54,500 – £69,000 | £68,500 – £88,000 |
| Large L-shape 32 m² | £60,500 – £73,000 | £69,500 – £88,500 | £88,000 – £112,500 |
Try the guide-price tool to see a range for your own size and finish.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Your questions about a wraparound extension in Swadlincote
Who do I contract with for a wraparound extension in Swadlincote?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does a wraparound extension take to build in Swadlincote?
On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do you cover all of Swadlincote?
Yes. We cover Swadlincote and the surrounding parts of Derbyshire. Site visits are free and there is no obligation.
Do wraparound extensions need planning permission?
Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Swadlincote
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.