house-extension.uk

Wraparound extensions in Sutton

From the first sketch to final sign-off, we plan and build wraparound extensions in Sutton and the surrounding Greater London area.

  • Guide price in SuttonFrom £46,500 inc VAT
  • PlanningUsually a householder application
  • Build time14–20 weeks on site
  • Postcode districtsKT4, SM1, SM2, SM3, SM5
L-shaped wraparound extension on a brick terraced house at dusk

What should I budget for a wraparound extension in Sutton?

Prices below are for Sutton, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Sutton: £2,600 to £4,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Compact L-shape
18 m²
£46,500 – £56,500£53,500 – £68,000£67,500 – £87,000
Medium L-shape
25 m²
£65,000 – £78,000£74,500 – £94,500£94,000 – £120,500
Large L-shape
32 m²
£83,000 – £100,000£95,500 – £121,000£120,500 – £154,000

Want a range for your exact size? The guide-price tool takes about a minute.

Covering Sutton

We cover Sutton and the postcode districts KT4, SM1, SM2, SM3, SM5, SM6. We also work in nearby Carshalton (2 miles), Wallington (2 miles), Worcester Park (3 miles), Coulsdon (3 miles).

Just over the Surrey border, Banstead is about 2 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.

What is included

  • Structural design for the corner and openings
  • Roof with glazing along the side return
  • Full internal finish or kitchen-ready shell
  • Party wall notice support (England and Wales)

Do I need planning permission in Sutton?

In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions people ask about wraparound extensions

Do you cover all of Sutton?

Yes. We cover Sutton and the surrounding parts of Greater London. Site visits are free and there is no obligation.

Who do I contract with for a wraparound extension in Sutton?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a wraparound extension take to build in Sutton?

On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Do wraparound extensions need planning permission?

Usually, yes. In England the side element counts as a side extension and the rear element as a rear extension, and the combination normally falls outside permitted development. A householder application costs £548 in England from 1 April 2026.

Will I need to move a drain?

Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.

Book a free site visit in Sutton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote