Wraparound extensions for homes in Morden
Planning a wraparound extension in Morden? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in MordenFrom £46,500 inc VAT
- PlanningUsually a householder application
- Build time14–20 weeks on site
- Postcode districtsCR4, SM1, SM3, SM4, SW19

What should I budget for a wraparound extension in Morden?
For Morden we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Morden: £2,600 to £4,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Compact L-shape 18 m² | £46,500 – £56,500 | £53,500 – £68,000 | £67,500 – £87,000 |
| Medium L-shape 25 m² | £65,000 – £78,000 | £74,500 – £94,500 | £94,000 – £120,500 |
| Large L-shape 32 m² | £83,000 – £100,000 | £95,500 – £121,000 | £120,500 – £154,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
What is included
- Party wall notice support (England and Wales)
- Householder planning application
- Roof with glazing along the side return
- Foundations, drainage and any manhole relocation
- Survey, design and 3D layout options
The corner is where wraparounds succeed or fail. We usually use a single steel goalpost or a corner post hidden in a pier, and set the glazing so the new room reads as one space rather than two boxes.
Will the council need to approve it?
In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Local to Morden
Our survey diary covers Morden, including CR4, SM1, SM3, SM4, SW19, SW20. Neighbouring towns we cover include Mitcham (1 mile), Wimbledon (2 miles), Worcester Park (2 miles), Tooting (2 miles).
Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Morden
Do you cover all of Morden?
Yes. We cover Morden and the surrounding parts of Greater London. Site visits are free and there is no obligation.
Do I need building regulations approval in Morden?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Morden be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is a wraparound better than a side return alone?
It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.
Will I need to move a drain?
Often. Side returns frequently contain a manhole or a shared drain. Building near or over a public sewer needs the water company’s consent in England and Wales, which we arrange.
Book a free site visit in Morden
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end