house-extension.uk

Strood wraparound extensions, designed and built

Planning a wraparound extension in Strood? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in StroodFrom £40,000 inc VAT
  • PlanningUsually a householder application
  • Build time14–20 weeks on site
  • Postcode districtsME1, ME2, ME4
L-shaped wraparound extension on a brick terraced house at dusk

Working in Strood

We cover Strood and the postcode districts ME1, ME2, ME4. We also work in nearby Rochester (1 mile), Chatham (2 miles), Gillingham (3 miles), Gravesend (6 miles).

In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.

How much does a wraparound extension cost in Strood?

These guide figures apply our South East England adjustment (×1.12) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Strood: £2,240 to £4,140 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Compact L-shape
18 m²
£40,000 – £48,500£46,000 – £58,500£58,000 – £75,000
Medium L-shape
25 m²
£56,000 – £67,500£64,000 – £81,500£81,000 – £104,000
Large L-shape
32 m²
£71,500 – £86,500£82,000 – £104,000£103,500 – £133,000

Try the guide-price tool to see a range for your own size and finish.

Included in a typical project

  • Party wall notice support (England and Wales)
  • Structural design for the corner and openings
  • Survey, design and 3D layout options
  • Roof with glazing along the side return
  • Foundations, drainage and any manhole relocation

Do I need planning permission in Strood?

In England a wraparound extension is assessed as both a side and a rear extension, and the combination usually falls outside permitted development, so most need a householder planning application (£548 from 1 April 2026).

The planning position for a specific Strood address depends on its history and any designations, which is why we check it at the first visit.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Your questions about a wraparound extension in Strood

Do you cover all of Strood?

Yes. We cover Strood and the surrounding parts of Kent. Site visits are free and there is no obligation.

How long does a wraparound extension take to build in Strood?

On site, typically 14 to 20 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Do I need building regulations approval in Strood?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Is a wraparound better than a side return alone?

It adds far more space, but costs more and needs planning permission more often. Our comparison guide sets the two side by side.

How much does a wraparound extension cost?

Our guide range is about £2,240 to £4,140 per m² including VAT. A 25 m² standard-spec wraparound typically lands around £64,000 to £81,500 in Strood before design and council fees.

Book a free site visit in Strood

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote